8 Installation of the SIHIdry Vacuum Pump
8.1
Preparation
Warning! Risk of injuries may occur due to untrained
personal.
Unauthorized and / or untrained person may get injured
during installation preparation and work.
Therefore:
Only authorized personal.
Use original spare parts.
Use only the accessories approved by the
manufacturer.
8.2
Safety
Warning! Before installation.
Therefore:
Connect the piping carefully to prevent misalignment
and danger of leakage.
Remove the protective caps from the flanges only
shortly before making connections.
Make sure that any shut-off valves in the suction or
discharge lines are closed.
Observe and follow local safety regulations/codes.
8.3
Special Tools
During installation – no special tools are required.
8.4
Permitted Environmental Condition
Read the instructions in chapter 7 Planning & Installation and the information stated on the data sheet.
8.5
Base Foundation
The pump unit is fitted with vibration damping feet and must be installed on a flat, vibration-free frame,
floor or foundation. Make sure that the loading capacity is sufficient.
8.6
Space Requirement
The dimensions of the pump set can be found on the arrangement drawing. Ensure easy access.
8.7
Check List before Installation
Before installing the pump unit the following points are to be checked:
1. Are all electrical supplies isolated?
2.
Are the suction and discharge lines empty, clean and free from debris such as weld slag, blast
sand, loose rust particles, foreign bodies etc.?
3. Have all site regulations been observed?