SVCN 7 INSTALLATION, OPERATION, & MAINTENANCE
be opposite signs. Total angularity must not exceed 0.001
inch per 12 inches (0.03 mm per 305 mm).
3. Check hold down bolt positions on the graph or otherwise determine the amount of shims to
be added or subtracted for the vertical correction, and the movement required for the
horizontal correction. If maximums are exceeded in this hot alignment:
a. allow units to cool down;
b. complete steps 19a through 19e, 20, and 21 of paragraph 2.2.5 starting on page 2-12
above;
c. repeat hot alignment procedure until TIR is within specifications.
DO2604-13
- 2-14 -
Summary of Contents for SVCN 7
Page 2: ...SVCN 7 PUMP INSTALLATION OPERATION MAINTENANCE 1 ...
Page 15: ......
Page 57: ......
Page 60: ...SVCN 7 INSTALLATION OPERATION MAINTENANCE 5 3 DO2604 13 ...