SVCN 7 INSTALLATION, OPERATION, & MAINTENANCE
1 1/8 in.
750
1,017
1 1/4 in.
1,050
1,424
4. Ensure that the rotor turns freely by turning the shaft with a strap wrench or by hand. Make
any corrections or adjustments necessary.
5. If your pump is equipped with packing, install the packing in accordance with paragraph
4.2.2, “Packing Installation”, on page 4-2.
6. Reinstall the bearing housing drain plug and fill the bearing housing (2998) to the prescribed
level with fresh lubricating oil (see paragraph 3.3, “Lubrication”, on page 3-4).
7. Reinstall the coupling spacer and coupling guard.
8. Reinstall all auxiliary piping or equipment which was removed for disassembly.
9. If the pump case and driver were not disturbed during the disassembly or assembly of the
pump, then perform a hot alignment check in accordance with paragraph 2.2.6, “Hot
Alignment”, on page 2-13. If the case or driver were disturbed, perform a cold alignment
check in accordance with paragraph 2.2.5, “Cold Alignment”, on page 2-9.
- 4-13 -
DO2604-13