6. The shipping papers should be checked to determine satisfactory arrival of any special tools,
loose parts, and/or spare parts (if provided), which are usually preserved and packed in a box
attached to the skid.
If any damage is indicated and/or parts are missing, notify the carrier and the nearest Flowserve office
immediately.
Upon conclusion of the receipt inspection, the shipping enclosure should be resealed for storage or
transport.
1.6 LIFTING
WARNING
Make sure that any equipment used to lift the pump or
any of its components is capable of supporting the
weights encountered. Make sure that all parts are
correctly rigged before attempting to lift.
1.6.1 LIFTING COMPLETE UNIT
WARNING
Do not lift the complete unit by slinging from pump case
and/or eye bolt on motor.
The coupling spacer must be removed from between
pump and driver half couplings before lifting the
complete unit.
To lift the pump and baseplate without the driver or the
baseplate alone, sling from all four eye bolts.
The pump, driver and baseplate can be lifted as a complete unit. Sling from all four eye bolts
provided on baseplate side rails. Failure to use all four could result in permanent distortion of the
baseplate. Use as long a sling as possible, or use a spreader arrangement. See Figure 1-1 below.
1.6.2 LIFTING DRIVER
Refer to driver manufacturer’s instructions.
1.6.3 LIFTING PUMP
CAUTION
To avoid shaft distortion, never lift the pump by the shaft.
Rig lifting straps at coupling end of bearing housing and at stuffing box extension. Make sure straps
are adjusted to obtain an even lift. See Figure 1-2 below.
- 1-5 -
DO2604-13
Summary of Contents for SVCN 7
Page 2: ...SVCN 7 PUMP INSTALLATION OPERATION MAINTENANCE 1 ...
Page 15: ......
Page 57: ......
Page 60: ...SVCN 7 INSTALLATION OPERATION MAINTENANCE 5 3 DO2604 13 ...