2. Ensure that the nozzle coverings are firmly in place. Periodically (i.e., every third inspection)
remove covers and visually inspect the accessible interior areas. If surface rusting has
occurred, clean and repaint or recoat with preservatives. Replace covers.
3. Check that the pump covering (i.e., plastic or tarps) is firmly in place. Any holes or tears must
be repaired to prevent entrance of dirt or water.
4. Check for any corrosion of the exterior surfaces. If rusting has occurred, clean and repaint or
recoat with preservative.
5. Loosen case drain plugs to allow seepage of any accumulated moisture.
6. Inspect individually wrapped parts for signs of deterioration. If necessary, renew preservative
and/or wrapping.
7. Document the results of the inspection and keep on file for later review.
1.7.3.1 Six Months Prior to Installation
Six months prior to the scheduled installation date, a Flowserve service representative is to be
employed to conduct an inspection of the stored equipment. This inspection should include, as a
minimum:
1. A review of all the inspection documentation for the stored equipment as kept on file by the
owner.
2. An inspection of the storage area to determine the as-stored condition of the equipment prior
to the removal of any protective coverings.
3. An inspection of the equipment with the protective coverings removed.
4. A partial or complete dismantling of the equipment may be required, depending on the length
of storage, the class/type of storage provided, and the results of steps 1 through 3 above.
5. Restoration of painted or preserved surfaces, and/or replacement of gaskets, O-rings, packing
or mechanical seals, and bearings.
Upon completion of the inspection the Flowserve representative shall submit a report to the
purchaser, and to the FLOWSERVE Manager of Customer Service, stating in detail the results of the
inspection.
1.7.3.2 One Month Prior to Installation
One month prior to installation of the equipment, a Flowserve representative is to be employed to
conduct a final inspection. This inspection will be made to ensure that the requirements of the six-
month inspection report were satisfactorily completed and that the equipment is ready for installation.
Upon completion of this inspection the Flowserve representative shall submit a final report to the
purchaser, and to the FLOWSERVE Manager of Customer Service, advising them of the results of
the final inspection.
1.7.4 PAINTING AND PRESERVATION
Paints and preservatives used are either Flowserve standard or as required by the contract
specification. Refer to your branch office through which the order was placed or Flowserve for the
description of paints and preservatives used on this order.
DO2604-13
- 1-8 -
Summary of Contents for SVCN 7
Page 2: ...SVCN 7 PUMP INSTALLATION OPERATION MAINTENANCE 1 ...
Page 15: ......
Page 57: ......
Page 60: ...SVCN 7 INSTALLATION OPERATION MAINTENANCE 5 3 DO2604 13 ...