SVCN 7 INSTALLATION, OPERATION, & MAINTENANCE
2. Place a lifting strap around the yoke of the head (85) as illustrated below. Take a strain on the
strap to support the weight of the head-rotor during removal.
Figure 4-1 Lifting Head-Rotor
3. Remove the head nuts (2666A). Install two jack screws in the head (85). Tighten jack screws
evenly to separate head and case.
4. Carefully withdraw head-rotor from case until impeller (34) is clear of case (37). Move the
head-rotor to area where disassembly will be performed.
5. Remove the head gasket (2988A) from the case (37) and/or head (85).
4.3.2 HEAD ROTOR DISASSEMBLY
1. Place the head-rotor on blocks in the horizontal position. Secure the head-rotor to prevent
tipping or rolling.
2. Using a torch, heat the pump half-coupling to about 300°F (149°C). Then use a coupling
puller to remove it from the shaft (1). Remove the coupling key (2966B).
NOTE
The impeller nut (238) or inducer (3186) has left-handed
threads.
3. Bend back the ear of the impeller lock washer (3151), then remove the impeller nut (238) or
inducer (3186) and lock washer. Then remove the impeller (34), impeller key (2966A), and
seal spacer sleeve (599) (if installed).
CAUTION
If your pump is equipped with a hook-sleeve type
mechanical seal or packing, pay close attention to the seal
sleeve when moving the head-rotor and removing the shaft
from the seal.
4. Rotate the head-rotor so that it rests in the vertical position with the head (85) on the bottom.
Support the head with wooden blocks to prevent damage to the shaft (1).
- 4-3 -
DO2604-13
Summary of Contents for SVCN 7
Page 2: ...SVCN 7 PUMP INSTALLATION OPERATION MAINTENANCE 1 ...
Page 15: ......
Page 57: ......
Page 60: ...SVCN 7 INSTALLATION OPERATION MAINTENANCE 5 3 DO2604 13 ...