WIK USER INSTRUCTIONS ENGLISH BO2662 5/09
Page 46 of 76
PART/ASSEMBLY
TASK SCHEDULE
INTERNAL
ASSEMBLY
INSTALL
INTERNAL
ASSEMBLY
1
INSPECT,
CLEAN, AND
REPAIR
BEARING PARTS
3
INSTALL HEAD
WITHOUT SEAL
HOUSINGS
2
CENTER ROTOR
AND DOWEL
HOUSINGS, IF
NECESSARY
4
REPLACEMENT
BEARING HOUSING
SET ROTOR
RUNNING
POSITION
5
ENSURE SEAL
HOUSING IS
REMOVED
2A
INSPECT,
CLEAN, AND
REPAIR
BEARING PARTS
3A
NEW
REPLACEMENT
BEARING
CENTER ROTOR
AND DOWEL
HOUSING, IF
REQUIRED
4A
INSPECT, CLEAN,
AND REPLACE
MECHANICAL
SEAL PARTS
6
MECHANICAL SEAL
INSTALL
INBOARD
MECHANICAL
SEAL
7
INSTALL
OUTBOARD
MECHANICAL
SEAL
8
INSTALL LOWER
BEARING
HOUSING
HALVES
9
INSPECT
BEARING PARTS
FOR
CLEANLINESS
3B
INSTALL
INBOARD
BEARING
10
INSTALL
OUTBOARD
BEARING
11
WRAP UP
INSTALLATIONS
12
DOWELED AND
CENTERED
BEARING HOUSING
OLD UNCHANGED
BEARING
Figure 6- 4 :
Task Schedule for Installation of Major Part/Assembly