Power Logger
Measuring
Functions
23
Split Phase
For Split Phase, the Neutral is center-tapped and there are two hot legs which
correspond to A and B test Leads. AB is the voltage from phase to phase,
which is twice that of each individual hot leg. Refer to Figure 6 and connect
the leads as follows:
Voltage:
Network Test
Leads
Line 1
A (L1)
Line 2
B (L2)
Line 1
C (L3)
N N
Current:
Network Test
Leads
A (L1)
A (L1)
B(L2) Line 1
B (L2)
Not connected Neutral
C(L3)
N N
Summary of Contents for 1735
Page 12: ...1735 Users Manual iv ...
Page 14: ...1735 Users Manual vi ...
Page 16: ...1735 Users Manual viii ...
Page 84: ...1735 Users Manual 68 ...