Preparing for Operation
Introduction
2
2-3
Introduction
This chapter describes how to prepare the instrument, host computers and network
for operation, and how to test and troubleshoot system operation.
Setting up your system requires the following steps (described in detail later in this
chapter), performed in the order shown:
•
Instrument Preparation
Unpacking and setting up the 2680 Series
instruments. This section of the manual describes all the connections, controls,
and indicators on the instrument.
•
Host Computer Ethernet Adapter Installation
Installing an Ethernet
adapter such as the 3COM Fast Etherlink 10/100 BaseTx interface card if your
host computer does not already have one.
•
Instrument and Host Computer Interconnection
Connecting the host
computer(s) and instruments.
•
Host Computer Software Installation
Installing Fluke DAQ software and
networking software.
•
Testing and Troubleshooting
Testing and verifying network operation, and
troubleshooting any difficulties.
Summary of Contents for 2680A
Page 8: ......
Page 14: ...2680A 2686A Users Manual vi ...
Page 20: ...2680A 2686A Users Manual 1 2 ...
Page 98: ...2680A 2686A Users Manual 2 62 ...
Page 196: ......
Page 228: ...2680A 2686A Users Manual A 32 ...
Page 236: ...2680A 2686A Users Manual C 4 ...
Page 242: ...2680A 2686A Users Manual D 6 ...
Page 274: ...2680A 2686A Users Manual 6 ...