Machine train alignment
The following is a step-by-step approach for measuring the alignment condition of a three-
machine train.
Groups of up to 6 machines coupled together may be measured.
The components should be mounted and laser beam adjusted as required.
From the home screen, tap
the "New asset" icon to create a new asset.
Note
The horizontal shaft alignment icon [
] may be used to create a new asset if it has
no check mark. The check mark on the icon denotes that another asset is currently
opened.
Tap the mini train inset at the top-right corner (
1
) to access the "Train set-up" screen.
Tap either of the two 'Add machine' icons [
] to add a machine to the respective side of the
train.
ROTALIGN touch EX
121
On-board help
Summary of Contents for PRUFTECHNIK ROTALIGN touchEX
Page 1: ...ROTALIGN touch EX On board help ...
Page 2: ...ROTALIGN touch EX On board help Version 2 3 Edition 03 2020 Part No DOC 52 202 EN ...
Page 11: ...This page intentionally left blank ...
Page 13: ...12 Version 2 3 On board help ...
Page 43: ...42 Version 2 3 On board help ...
Page 137: ...136 Version 2 3 On board help ...