OPERATING INSTRUCTIONS
18
Side channel blower
Version: 27222 - C
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
Installation situation
Fig. 5:
P1 Air pad
P2 Pressure-end shut-off unit
P3 Heater (additional accessory)
P4 Pressure end
P5 Suction end
P6 Side channel blower
P7 Pipeline
Y
Air loop y= min. 50 cm
The side channel blower must be installed so that the air loop is always at least y= 0.5 m
above the water level.
One side channel blower can supply several air pads with compressed air.
The air pad can be installed in the bottom. It can also be built into a bench or reclining
recess.
3.3.1
Before starting to set up, check the following