248
Nynja Build manual 1.0
Figure 333 flap neutral setting.
d) If flaps cannot meet this position with adjuster screwed fully in, of the flap rod
can be shortened by redrilling the hole at its lower end where it attached to the
stainless angle piece, 20mm above the original hole.
e) Check the neutral positions and operation of the ailerons.
Ensure that the stick is kept central whilst adjusting the ailerons.
The ailerons should be set with their trailing edges level with those of
the flaps.
Check that the aileron upward movements are around 25
using a
protractor. The downwards movement is less, due to the differential
built into the system.
If necessary, restrict the movement by increasing the diameter of the
stops at the torque-tube horn, using tape around the tube to pad-out the
stops.
f) Check the tension in the aileron cables.
It should require around 2kg of force to pull the long aileron cable down
at its centre to touch the upper cabin triangle tubes TU10‟s
g) If there is any remaining friction in the aileron control circuit, the fit of the
aileron hinges must be checked.
The ailerons should drop freely under their own weight with the cables
detached. If any friction is felt then remove the aileron eyebolt hinges
and file the holes in the aileron leading edges until the ailerons move
freely. This will greatly improve the feel of the aileron controls.
A touch of oil / grease on the hinges works wonders
125mm
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...