SHELVING
ASSEMBLY INSTRUCTIONS
Item# FAKDBR20 and FAKDBR12 |
Aluminum Bakery Rack
Part
Side Panels
1" diameter Rods
3
/
4
" diameter Rods
Casters
1
1
/
8
" Screws
U-Brackets
2" Screws
Qty
2
2
4
4
8
8
4
Step 1
Unpack carton, identify & confirm quantity of components.
Step 2
Insert casters into openings at the bottom of the side panel,
see Diagram #1
. Make sure that hole in
caster stem is aligned with hole in side panel opening.
Step 3
Align threaded opening in 1" diameter rod with opening of inside side panel. Thread 2" screw through the
side panel opening and into threaded opening of 1" diameter rod and loosely tighten.
See Diagram #2
.
Make sure screw head is on the the outside of the side panel.
Step 4
Repeat Step 3
for other 1" diameter rod.
Step 5
Insert
3
/
4
" diameter rod into inside side panel opening.
Step 6
Align opening in U-bracket with the opening in the outside of the side panel,
see Diagram #3
.
Step 7
Thread 1
1
/
8
" screw through U-bracket and into
3
/
4
" diameter rod and loosely tighten,
see Diagram #4
.
Step 8
Repeat steps 5 through 7
for other 3
3
/
4
" diameter rods.
Step 9
Place side panel on ground with insert rods facing up.
Step 10
Place other side panel on top of side panel on the ground so that rods fit into side panel openings.
Step 11
Insert casters into openings at the bottom of side panel (
follow step 2
).
Step 12
Thread 2" screw through the side panel opening and into threaded opening of 1" diameter rod and
loosely tighten.
See Diagram #2
.
Step 13
Repeat step 12
for the other caster.
Step 14
Align opening in U-bracket with the opening in the outside of the side panel,
see Diagram #3
.
Step 15
Thread 1
1
/
8
" screw through U-bracket and into smaller diameter rod and loosely tighten,
see Diagram #4
.
Step 16
Repeat steps 14 & 15
for other 3 U-brackets.
Step 17
Stand unit upright and tighten all screws.