35
~75
Only for models from
45 to 85
Use teflon
Use teflon
Use teflon
Check that the return collector is approximately positioned according to the value indicated in the figure.
WARNING
For 120 and 150 boiler models: before mounting the pump under the boiler it is necessary to mount the supplied wiring
to the pump.
DIRECTION
TOWARDS THE
BOILER
DIRECTION
TOWARDS THE
BOILER
Fasten the components of the hydraulic part paying attention to the installation direction of the non return valve and the installation
direction of the circulation pump.
Fasten the hydraulic components between the boiler and the return collector.