41
Fit the trap on the boiler as described on page
32
.
Connect the boiler condensate drain to the drain pipe.
Use teflon
Fit the gas tap.
The fitting operations of an hydraulic unit for 120 - 150 boiler model are described below. If a boiler with output up to 85 is installed,
refer to the figures above.
120 ÷ 150
Fasten the gas pipe by placing the gaskets supplied in-between.
WARNING
For models from 45 to 85, add the fitting under the boiler.