Page
11
of
18
11
12
Do not leave the cable hanging
under the support.
13
Install the second binding, the
battery and connect the luminary
15
Assemble the PV
10
9
Box Energy
Labels up
Same steps as step 7.
Pass the cable under the battery.
Energy Box label should be positioned always
to upside (direction to PV).