background image

FontanaShowers

©

FontanaShowers

©

FontanaShowers

FontanaShowers

Customer Service: 800-684-4489

fontanashowers.com

3

1. Remove the old shower head by using the channel lock pliers or monkey wrench. Be 

sure to turn the pliers counter-clockwise to loosen the old shower head. (tip: right is tight, 

left is loose.)
2. Remove the shower arm by turning it by hand counter-clockwise.Make sure you 

remember to apply putty or tape to the new arm. (tip: using teflon tape is less messy)
3. Apply teflon tape to the threading of the shower arm by wrapping it around the threads, 

go all the way around 3 or 4 times depending on the quality of the teflon tape.
4. Install the new shower arm by going clockwise by hand until it is tight, then put painters 

tape around the arm and tighten the arm with the channel lock or monkey wrench.
5. Place teflon tape around the threads on the shower head and then place the shower 

head onto the shower arm by turning the shower head clockwise after the shower arm is 

already in the wall.t

Step 7:

Step 8:

Step 9 (Note):

Product shown is only for installation display purpose

Summary of Contents for FS-5802

Page 1: ...ease read installation instructions below All plumbing should be installed in accordance with applicable building codes and regulations Unpack and inspect the items for any shipping damages If you find damages do not install All products must be installed by a professional and certified plumber otherwise warranty may be voided PRIOR TO INSTALLATION 16 NICKEL BRUSHED RAINFALL SHOWER HEAD ULTRA THIN S...

Page 2: ...FontanaShowers FontanaShowers FontanaShowers FontanaShowers Customer Service 800 684 4489 fontanashowers com 2 Wall Mount Shower Installations Instructions Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 ...

Page 3: ... teflon tape is less messy 3 Apply teflon tape to the threading of the shower arm by wrapping it around the threads go all the way around 3 or 4 times depending on the quality of the teflon tape 4 Install the new shower arm by going clockwise by hand until it is tight then put painters tape around the arm and tighten the arm with the channel lock or monkey wrench 5 Place teflon tape around the threads...

Page 4: ...ructions Step 1 Step 2 Step 3 Step 4 Step 5 If you have opted for LED option The LED light will change its color by detecting water temperature 0 30 C 32 86 F Blue LED 30 40 C 86 104 F Green LED 40 50 C 104 122 F Red LED 50 100 C 122 212 F Flashing Red LED Note The LED lights are powered by water flow and will be activated once the water is turned on ...

Page 5: ...y 3 It is not required to use any abrasive cleaning pads wire wool or cloths to clean the product 4 Avoid a vigorous cleaning action as this could contribute to denaturing and dulling 5 Abrasive or strong cleaning products containing ammonia bleaches alcohol dyes acids hydrochloric formic phosphorus chlorine or acetic will be not be affected 6 If using a spray cleaner apply the cleaning agent onto...

Reviews: