24
Step 16
Important:
Study and follow the diagram carefully.
A
Attach the 4400 mm Upper cable (
131#
) through the opening of the upper frame
(
7#
)
, Make sure
the ball stopper should be in front of the upper frame, Place 1PC Pulley (
162#
) below the cable and
secure the 1
st
pulley using 1PC M10 × 50 Allen bolt (
95#
) ,2PC ø10 washer (110#) and 1
×
M10
Aircraft nut (109#).
B
Draw the cable backwards and place the 2
st
pulley below the cable , Secure the pulley with the same
way in A.
C
Draw the cable around the pulley and front , Place the 3
st
pulley below the cable and secure it with
1PC M10
×
150 Allen bolt (88#), 2PC ø10 washer (110#) and 1
×
M10 Aircraft nut (109#).
D
Draw the cable around the pulley and backwards,Place the 4
st
pulley below the cable and secure it
with the same way in A.
E
Draw the cable around the pulley and upwards,Place the 5
st
pulley below the cable, Secure the
pulley with 1pc M10*70 Allen bolt(93#), 2PC ø10 washer (110#) and 1
×
M10 Aircraft nut (109#).
F
Draw the cable around the pulley and downwards ,Place the 6
st
pulley onto the cable and secure it
with double floating pulley bracket(41#) together with the way in A.
G
with the same way in E.
H.
Draw the cable around the pulley and downwards,Place the 8
st
pulley onto the cable and secure it
with double floating pulley bracket(42#) together with the way in A.
I.J.
Draw the cable around the pulley and place the 9st and 10stpulley below the cable, Secure them
with the same way in A.
Thread the end of the upper cable to the top opening of the selector rod at least 5 laps to keep safe.
Summary of Contents for JX-DS926
Page 4: ...2 3...
Page 5: ...4...
Page 6: ...5...
Page 7: ...6 6...
Page 24: ...Assembly Instructions 23...
Page 26: ...Assembly Instructions 25...
Page 28: ...Assembly Instructions 27...
Page 30: ...Assembly Instructions 29...
Page 32: ...Assembly Instructions 31...
Page 34: ...Assembly Instructions 33...