background image

12 

AXEL 

 

 

Optional 
FA31 on 
input E 

standard 
FA31 on  
input F 

Photobeam wiring 

 

The first photobeam on F (yellow) is 
compulsory.  The  E  input  (brown)  is 
optional.  Inputs  can  take  multiple 
safety  devices  when 
their  volt  free  contacts 
are  wired  in  series. 
Note jumper position ! 

Beam 

 

            Fig 26 

 

DRI edge 

on the end 

of the gate  

E or F 

 

power 

Beam 

 

         Fig 27 

 

One DRI  
edge on 

on a pier  

 

power 

  Beam   

                           Fig 28 

 

Wiring 2 DRI’s

 

 

Yellow    

 NC 

Blue 

    Com 

Black

   Gnd 

Red

   Supply 

 
power 

Open Timer 

 

A wired switch or timer can hold a gate 
open.  The  N/O  contact  opens  the  gate 

[G].

 The N/C contact stops it closing 

[F]

.  

This  circuit  comes  between  RIO-X  and 
safety circuits on this page.  

Fig 31 

Fig 24 

 

 

 

 

Fig 25 

Beam 

 

         Fig 30 

 

DCY  

or DTE 
 edges 

 

power 

Beam 

 

         Fig 29 

 
 
 
 
 
 

 

Power 

 

Repeater circuit for ring of 
beams. Each Rx enables the 
next Tx. Only requires power. 

Summary of Contents for AXEL F730

Page 1: ...www forematic com Underground gate opener AXEL AXEL F730 installation...

Page 2: ...nd up to date Technical Specifications Supply volt age 220 240Vac Motor power 100W 24Vdc Supply rating 2 5A 50 60Hz Motor torque 250Nm max Standby power 10W Motor insula tion IP67 Ambient temp 20 to 7...

Page 3: ...compliance that ensure the gate is safe to users and public Automatic gate signs are required on both sides of the gate warning against risk of contact injury The installer must prepare a handover pac...

Page 4: ...s The most common D requires the gate to be off centre and therefore will require a safety edge to protect the pinch hazard E is on centre but leaves a sight gap or you need to cope with a rear hung g...

Page 5: ...ently fill the casement then fill the soakaway Consider a surface drain Wood swells when it absorbs moisture A gap between gate boards and between gate leaves is essential Any sight gap between leaves...

Page 6: ...or with steel post reinforcement That is a decision beyond the scope of this manual Two concrete bases are required for the piers set at precisely the same level Level off 170mm below road level to g...

Page 7: ...ss control it is normally fitted to the left pier because that is the side visitors get out of their vehicles Height is typically 1 5m Leave a suitable duct access hole Ducts will run either to the co...

Page 8: ...you need the gate to open less you can fit an addition ground stop Fit the stub axle plate and stop plate over the exposed studs in the upper shelf then fix with the locking nuts Fig 12b Motor arms M...

Page 9: ...ter the panel through glands Running the cables behind the PCB keeps the limited space tidy It is better to hide cables than cut them too short Mark all cables The wiring plan below shows individual c...

Page 10: ...Move the green wire to D for single leaf door opening Remotes can be set for these two functions See user instructions SAFETY DEVICES F C or E C There two inputs are for safety devices Input F preven...

Page 11: ...o work during the day could be viable free entry device for a commercial property Keypads are useful for friends family or trusted delivery drivers This keypad can accept many codes and some for singl...

Page 12: ...hinge position is on the pier corner so finger traps are less likely Fig21 An safety edge has been added to the gate leaf that closes last There are now two devices on F wired as Fig26 or Fig27 Fig22...

Page 13: ...nd of the gate E or F power Beam Fig 27 One DRI edge on on a pier power Beam Fig 28 Wiring 2 DRI s Yellow NC Blue Com Black Gnd Red Supply power Open Timer A wired switch or timer can hold a gate open...

Page 14: ...y 100 010 110 001 101 011 111 5s 15s 20s 60s 65s 75s 80s Delay 2s 3s 4s 5s DIP 1 2 opening 00 10 01 11 DIP 3 4 closing 00 10 01 11 PCB buttons There are two buttons on the PCB The CODE button is used...

Page 15: ...ial for force test limits The safe force limits need to be observed Adjusting the first 3 settings will help comply The adjustments above should not affect the limit learning Small changes in physical...

Page 16: ...p to maintain safety Our website PICO support page has fault finding support You can save up to 50 remotes There are two remote channels Pedestrian channel opens one gate only Main opens both You will...

Page 17: ...ords Activation Input Position Device code G Fault finding There are 8 LED s on RIO X that show the states of inputs and the gate position Gate runs slowly This happens when there has been a loss of p...

Page 18: ...de of Practice can be found at www dhfonline org uk Force testing EN12445 explains the method of testing the impact forces of a gate The crux is a graph of acceptable forces from the point of impact S...

Page 19: ...of Practice Draw in or Shear Gaps where a body part could be drawn in are not allowed Limbs have different nominal sizes Finger gaps need to be less than 8mm D2 arms less than 100mm etc A solid infil...

Page 20: ...ot accept costs for dismantling installation or for carriage Parts replaced under warranty are the property of the warrantor The warranty period for Radio Equipment is 24 months The period for replace...

Reviews: