background image

 6

 8

Forest Garden Ltd, Units 291 & 296 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB 

Trim off any excess felt that may protruding beneath 
the barge boards.

5

7

 

 

F

Place the roof board onto a 1540mm batten making sure that the board is 
flush on all sides. Fix the batten in place using 4 x 25mm screws.

Repeat for the other roof section.

   

Maintenance.

We recommend that you treat your shed at the beginning of each season with a

 

wood preservative treatment. Apply in 

accordance with the manufacturers instructions.

Regularly check all fixings are secure.

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Celcure AC-500, incorporating biocidal products to give p

rotection against wood destroying insects & wood rotting fungi.

 

Contains:

 Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.

 J

Lift the roof sections into place ensuring that 
they are in line with the apex and the front and 
back panels of the shed.

Fix the roof section in place using 3 x 25mm 
screws for each end and 3 x 30mm screws for 
the sides. Make sure the screws locate into the 
framing.

Repeat for the other roof section.

Attention

Take care when cutting and 
trimming the roof felt

Apex

Eaves

K

 I

 J

Unroll the felt and cut it into two equal lengths. Place each 
section so that they overlap at the apex and overhang on the 
eaves by approximately 50mm. Fix the felt to the roof using felt 
nails spaced in 150mm intervals along the edges and the 
seam. Make sure that the felt nails are positioned so that each 
locates into the batten on the eaves. Cut and fold the corners 
securing with a single felt nail.

Place the barge boards against the ends of the shed 
so that they are flush with the overhang of the roof 
and in line with the top. Fix each in place using 
3x30mm screws.

Place the finials over the joins making sure they are 
centred. Secure in place using 2x30mm screws for 
each. (Make sure you pre-drill)

Reviews: