8’ x 6’ Overlap Apex Shed
Fixing Pack (OPA68ONFP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Important :
Assembly of this
shed requires a
minimum of two
adults.
MUST PRE-DRILL
Issue 0119
B
OPA6PE
PLAIN END
OPA8WS
WINDOW PANEL
OPA8PS
PLAIN PANEL
C
D
E
K
F
45452275PPT
2275mm BATTEN QTY 4
FIN20010512PT
FINIAL
QTY 1
A
OPA68ON PARTS LIST
1
4
BRDFL46
FLOOR QTY 2
SDRPT
DOOR QTY 1
OPA6DE
DOOR END
44161570PT
1570mm CORNER STRIP QTY 4
L
O
P
J
Top View
2
D
C
Z’ bracket Qty 8
30mm Screw Qty 17
50mm Screw Qty 66
25mm Screw Qty 33
45120675PPT
675mm STRIP QTY 1
M
PCWIN1
WINDOW QTY 2
The windows are packed together
tightly, separate before assembly.
75121110PAII62PT
1110mm ANGLED BARGE BOARD QTY 4
20121695PPT
20 x 1695mm STRIP QTY 1
N
84996
675mm PLASTIC STRIP QTY 4
Q
Fix both of the floors together using 2x50mm
screws screwing through the floor bearers as
shown.
Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.
When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure the screws are
positioned so that they locate into the bearers underneath.
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
3
N
Flush Hinge
Qty 2
Hasp &
Staple
C
B
A
E
D
M
P
5
Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3x30mm screws.
40mm Screw Qty 12
A
F
IMPORTANT, RETAIN FOR FUTURE REFERENCE;
READ CAREFULLY
This building is pressure treated to ensure longevity of all
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises. This will not need additional
treatment.
- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Please keep all plastic bags and small parts away from
children
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
Technical Help line:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
25mm Security Screws
Screws Qty 12
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE
SCREWDRIVER
TAPE MEASURE HAMMER
SHARP KNIFE
FLAT HEAD
SCREWDRIVER
SCISSORS
Place the hinge against the inside of the door frame and position the large section of the hinge so
that it is flush with the inside of the framing as shown and fix with 25mm screws.
Open the hinge and fix the smaller section to the door framing. Again make sure that the hinge is
flush and that the holes are positioned so that the 25mm screws locate correctly into the batten.
H
ORS1X866
ROOF SHEET
QTY 6
I
VG1000
VERGE (apex)
QTY 3
Hats Qty 40