background image

8’ x 6’ Shiplap Apex Shed

Important :

Assembly of this

shed requires a

minimum of two

adults.

MUST PRE DRILL

-

Issue 0119

B

SDA6PE

PLAIN END

SDA8WS

WINDOW PANEL

SDA8PS

PLAIN PANEL

C

D

E

Q

F

FIN20010512DTR

FINIAL QTY 1

A

SDA68ON PARTS LIST

1

4

BRDFL46

FLOOR QTY 2

SDRDT

DOOR QTY 1

SDA6DE

DOOR END

40121570PARDTR

1570mm CORNER STRIP QTY 4

K

N

M

Top View

2

D

C

45120675PARDTR

675mm STRIP QTY 1

P

RPET700

WINDOW QTY 2

The windows are packed

together tightly, separate

before assembly.

75121110PAII62DT

1110mm ANGLED BARGE BOARD QTY 4

20121695PDT

20 x 1695mm STRIP QTY 1

O

84996

675mm PLASTIC STRIP QTY 4

L

Fix both of the floors together using 2x50mm
screws screwing through the floor bearers as
shown.

Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.

When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure the screws are
positioned so that they locate into the bearers underneath.

Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.

3

C

B

A

E

D

5

Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3x30mm screws.

A

F

Place the hinge against the inside of the door frame and position the large section
of the hinge so that it is flush with the inside of the framing as shown. Fix with
25mm screws.

Open the hinge and fix the smaller section to the door framing. Again make sure
that the hinge is flush and that the holes are positioned so that the 25mm screws
locate correctly into the batten.

M

N

O

IMPORTANT, RETAIN FOR FUTURE REFERENCE;

READ CAREFULLY

This

is

building

pre-treated with a factory base coat for

protection during storage and transit. We recommend that
you treat your new building as soon as possible after
assembly using a wood preservative treatment. Apply in
accordance with the manufacturers instructions.

- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children

Technical Helpline:

0333 7777 089

8.30 am and 5.00

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.

45452275P

2275mm BATTEN QTY 4

J

I

VG1000

VERGE (apex)

QTY 3

Fixing Pack (OPA68ONFP)

This fixing pack is used for several products.
There may be additional fixings.

Not to Scale

Z’ bracket Qty 8

30mm Screw Qty 17

50mm Screw Qty 66

25mm Screw Qty 25

Flush Hinge

Qty 2

Hasp &

Staple

40mm Screw Qty 12

25mm Security Screws

Screws Qty 12

REQUIRED TOOLS :
(NOT SUPPLIED)

POZI DRIVE

SCREWDRIVER

TAPE MEASURE HAMMER

SHARP KNIFE

FLAT HEAD

SCREWDRIVER

SCISSORS

Hats Qty 40

H

ORS1X866

ROOF SHEET

QTY 6

Reviews: