Mark and position a handle on to each of the doors. Fix
each using the 4 x 20mm screws provided.
ATTENTION:
TAKE CARE
WHEN TRIMMING
THE ROOF FELT.
X
S
G
V
11
10
Place two pieces of the felt on the lower sections of the roof. Make sure these are
positioned centrally and have an overhang of approximately 50mm. Secure each piece in
place using felt nails spaced in 150mm intervals.
Place the third sheet of felt over the top of the apex so that it overlaps the other two
sections. Again secure this in place using felt nails spaced in 150mm intervals.
.
Secure the top of the veranda
post (V) to the roof section
using 1 x 50mm screw.
G
1. Place a roof section so that it
sits on top of the panels and is
flush with the back. It also need to
be in line with the apex.
2. Fix this in place using 3x60mm
screws to secure it to the end
panel screwing up through the
framing.
3. Fix the roof to the side section
again screwing up through the
framing using 3 x 70mm screws.
4. Place another roof section
against the back roof section and
fix to the panels the same way.
Additionally secure the roof
sections to each other using 3 x
70mm screws.
Repeat for the opposite side.
5. Screw down through each of
the roof sections into the apex
batten (S) using 2 x 60mm screw
for each section at the back and 1
x 60mm screws for each front roof
section.
4
2
5
Biocidal Product Regulation
(EU 528/2012) Article 58
Information
This article contains timber
treated with Celcure AC-500,
incorporating biocidal products to
give p
rotection
against wood
destroying insects & wood rotting
fungi.
Contains:
Basic copper carbonate
(Copper (II) carbonate – Copper
(II) hydroxide (1:1)), Boric acid,
Benzalkonium chloride.
Wear gloves when handling
freshly treated wood. Avoid
breathing dust when cutting
treated or untreated wood.
Dispose of off-cuts responsibly –
do not burn.
Maintenance.
- Regularly check all fixings and
parts are secure.
- Visually check for wear and tear.
- Check your roof felt for tears and
leaks.
Place a finial (X) over the join of both barge boards at the
apex.
Fix each in place using 2 x (3.5 x 30mm screws)
Place each of the barge
boards (S) so that they are in
line with the top of the roof and
overhang the eaves by 32mm.
Fix each barge board in place
using 3 x (3.5 x 30mm
screws).
Trim off any excess felt that
sticks out below the boards.