background image

A

B

C

D

PRE-DRILL

PRE-DRILL

PRE-DRILL

a

e

The batten should be fixed so it is

tight against the horizontal battens

on the reverse of the door and offset

14mm from the top.

3

1

4

8

f

f

f

f

f

e

e

e

e

2

e

Place the panels on top of the

base making sure that they are

all tight and flush before fixing

the panels together using 3 x

50mm screws for each corner.

Fix the front and back panels to

the floor using 2 x 50mm screws

for each screwing down through

the framing from inside.

f

f

f

f

f

f

f

f

f

f

5

7

8mm

10

9

16

Place the angled boards against the

front and back panels as shown to

create an apex. Fix each board in

place using 2x 25mm screws.

fd

fd

16 is for the
Overlap Garden
Store only.

Fix each of the corner strips along the

edges so that they are flush and fix

each in place using 4 x nails.

f

f

f

f

Floor Assembly

Board and batten
should be flush.

Slamming Strip

28mm

Offset from
top 14mm

Summary of Contents for OPATSFP

Page 1: ...portant Assembly of this product requires a minimum of two adults OPATGS Pressure Treated Overlap PARTS LIST Attention n For Domestic Use Only n Must be built on a and solid level base n Regularly check that all fixing are tight and secure n Regularly check the felt for damage Item Part Code Part Description Quantity 1 SPTSBP SLAP PTR TALL STORE BACK PANEL 1 2 SPTSSP SLAP PTR TALL STORE SIDE PANEL...

Page 2: ...ch corner Fix the front and back panels to the floor using 2 x 50mm screws for each screwing down through the framing from inside f f f f f f f f f f 5 7 8mm 10 9 16 Place the angled boards against the front and back panels as shown to create an apex Fix each board in place using 2x 25mm screws f d f d 16 is for the Overlap Garden Store only Fix each of the corner strips along the edges so that th...

Page 3: ...battens as shown using nails Repeat for the other roof section Slot the roof sections so that they line up at the apex Fix these from the inside screwing through the apex boards into the 296mm battens using 2 x 25mm screws for each Apex Boards Place the felt over the roof so that there is approximately a 45mm overhang on all sides Secure the felt to the roof nailing into the ba ens from the sides ...

Page 4: ... the short side and off set 10mm from the long side Fix the battens in place using 2 x 25mm screws for each Repeat with the remaining blocks and 481mm board 110cm 50cm 183cm 95cm Forest Garden Ltd Unit 288 Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB Issue 0617 Make sure that the screws are positioned so that each locates into the batten PRE DRILL PRE DRILL PRE DRILL ...

Reviews: