I
J
K
6
15
14
d
d
d
d
d
d
d
d
d
d
Position and line up the hasp
and staple with framing on the
inside of the door.
a
d
x 7
Fix the 481mm board to two of the 70mm battens.
These should be flush on the short side and off set
10mm from the long side. Fix the battens in place
using 2 x 25mm screws for each.
Repeat with the remaining blocks and 481mm board.
110cm
50cm
183cm
95cm
Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury | Worcestershire | DY10 4JB
Issue 0617
Make sure that the screws are
positioned so that each locates
into the batten.
PRE-DRILL
PRE-DRILL
PRE-DRILL