background image

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

Top V

iew

2

1

A

K

B

A

C

A

Place two of the panels against the plain end making sure 
that the framing is flush. Fix the panels together using 2 x 
50mm screws.  Repeat for the remaining panels.

Fix an 1172mm batten (pressure treated) to 
the bottom of each panel making sure that it is 
flush on all sides. Fix each batten in place 
using 2 x 50mm screws.

B

A

A

C

M

Place the remaining 1172mm batten so that 
it bridges the door end and plain end at the 
top as illustrated. Fix this in place using a 
50mm screw at each end screwing at an 
angle.

Place a corner strip to each corner 
making sure that it is flush. Secure each 
strip in place using 3 x 25mm screws.

N

N

3

4

LEFT

BACK

C

A

A

N

N

Summary of Contents for PEACH PLAYHOUSE PH1

Page 1: ...sembly of this product requires a minimum of two adults only PH1 Parts list 14 C Issue 0414 Attention This instruction is used for several different buildings Please quote from the correct parts sheet when ordering replacements MUST PRE DRILL SPIRIT LEVEL D F A G H M E K N L 40120530PAIIDT Strip 530mm Qty 2 PH1PE Plain End Qty 1 12566908 Roof Sheet Qty 2 PH1PP Plain Panel Qty 2 PH1DR Door Qty 1 PW...

Page 2: ...Fix an 1172mm batten pressure treated to the bottom of each panel making sure that it is flush on all sides Fix each batten in place using 2 x 50mm screws B A A C M Place the remaining 1172mm batten so that it bridges the door end and plain end at the top as illustrated Fix this in place using a 50mm screw at each end screwing at an angle Place a corner strip to each corner making sure that it is ...

Page 3: ...t be no less than 12mm The gap on the opening side must be less than 5mm 5 Place the handle half way up the door against the edge of the board Position the magnetic plate on the reverse of the door opposite the handle Use 2 x 25mm screws to fix both the plate and handle to the door screwing from inside 6 Place the door block against the front and in line with the side of the door end Making sure t...

Page 4: ...the felt nails provided spaced at 150mm intervals Place each roof section on to the building so that they are in line with the apex Fix the roof sections in place using 3 x 25mm screws for each end screwing into the panels framing Further secure the roof using a 30mm screw through the roof into the centre of the side panel framing Maintenance After assembling the building we recommend that you tre...

Reviews: