background image

Issue 0117

Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury| Worcestershire | DY10 4JB

H

e

lp

li

n

e

:

0

8

:3

0

to

1

7

:0

0

M

o

n

d

a

y

to

F

ri

d

a

y

0

3

3

3

7

7

7

7

0

8

9

22

Place the bottom fascia boards against the outside of the deck

so that they are tight under the notch, flush with the deck and
line up at the corners. Fix each board in place using 8x50mm

screws.

Starting from the top and working down secure each of the

boards to the rafters and the stepped rafter using 2x25mm

screws.

The top, smallest board will only need 1x25mm screw for each

end.

a

a

b

x2

9

8

a

a

b

x2

b

x2

b

x2

Summary of Contents for Venetian Pavilion

Page 1: ...564mm PAR ANGLED PTREAT 4 12 150141375PARA2PTR BOARD 150x14x1375mm PAR ANGLED PTREAT 4 13 150141187PARA2PTR BOARD 150x14x1187mm PAR ANGLED PTREAT 4 14 150140998PARA2PTR BOARD 150x14x998mm PAR ANGLED PTREAT 4 15 150140810PARA2PTR BOARD 150x14x810mm PAR ANGLED PTREAT 4 16 150140621PARA2PTR BOARD 150x14x621mm PAR ANGLED PTREAT 4 17 150140433PARA2PTR BOARD 150x14x433mm PAR ANGLED PTREAT 4 18 124140244...

Page 2: ...teps of the instructions first Working around clockwise place and secure each of the bearers inside the corner feet using 4x50mm screws at each end Turn the base over and secure the notched bearers using 2x50mm screws for each end Measure and position the bearers starting with the middle so that they are all spaced equally Turn the base back over b b b 1 ...

Page 3: ...l along the length of each post to make sure the product is still level and square When all of the sections are in place secure them to the posts with 2x50mm screws for each end Slot each of the posts into the top of corner feet You may need to use a rubber mallet to make sure these are in tight and flush Fix the top ring of fascias so that they sit on the lip of the posts and all meet up at the e...

Page 4: ...level d e 4 d Fix two of the rafters to the finial at right angles screwing through the finial into the end of the rafters with a single 100mm screw for each Lift the rafters on top of the pavilion and line the notches up You will need a person on a ladder in the middle of the structure to keep the rafters in place and use small adjustments to make sure they are level and at the correct pitch Fix ...

Page 5: ...e boards up against this so that they are flush on each end and secure every fourth board just using 2 x 50mm screws for each end Don t secure the last two boards from the end of the deck at this point You will need to measure up and notch the last board Repeat this procedure for the opposite side before fixing down each board properly using 2x50mm screws for each bearer they cross Remove this boa...

Page 6: ...ia boards against the outside of the deck so that they are tight under the notch flush with the deck and line up at the corners Fix each board in place using 8x50mm screws Starting from the top and working down secure each of the boards to the rafters and the stepped rafter using 2x25mm screws The top smallest board will only need 1x25mm screw for each end a a b x2 9 8 a a b x2 b x2 b x2 ...

Reviews: