Please make sure you have
purchased and assembled
the modular pergola base kit first.
Ensure there is
enough working space when attaching your panels.
CONTINUATION..
2 x PANELS
1
2
60
MM
SCREWS
Ensure the panel is in contact with the
70x70mm frame &
screw to post.
Screw 3rd panel to the post.
Ensure panel is
15mm down from the central beams / at the
same height as the other 2 panels.
60
MM
SCREWS
15mm
60
MM
SCREWS
60
MM
SCREWS
4 x PANELS
Repeat
for other panel & s
crew panels
together.
Screw
through the
fascia
into the
panel
for extra rigidity.
Screw the cover strip
in between the 2
meeting internal panel faces.
Repeat
for other panel & s
crew panels
together.
Screw
through the
fascia
into the
panel
for extra rigidity.
Screw the cover strip
in between the 2
meeting internal panel faces.
.