CLEANING & SEALING (WINDOW & DOOR)
Place the ledge onto the silicone. Ensure it is
level and the back edge meets the first edge of
the back OSB sheet (The same positioning as the
window).
159
159
WINDOW GLAZING & DOOR FRAME
Lift and angle the frame and sit into the ledge.
Butt up against the wall panel.
160
160
Insert the window frame into the left hand side
of the double doors. The metal cap will slot into
place.
164
164
Further secure the window with 1 x 112mm screw
into the top and 1 x 112mm into the bottom.
166
166
(This section is only for the ‘Xtend Plus’ doors
and side window. This step will not apply to the
standard option).
Use 3 x 35mm screws to secure
the metal capping.
163
163
Check that frame is both level and plumb, then
drill fixing holes into the frame side.
161
161
These should be drilled 150mm from the top and
bottom corners and 300mm from the 150mm
points with the 112mm screws.
162
162
Drill 150mm from the top and bottom corners and
300mm from the 150mm points with the 112mm
screws into the double doors and into the wall
panel on the opposite side.
165
165
27