Operator's Manual
3950 Series
Deliveries
39
15. DELIVERIES AM 52, AMS 52, SKM 36
8
9
1
13
12
11
14
!
When making or breaking any electrical
connection, always first turn off the main
switch or the safety switch of the folder.
Non-compliance may cause damage to
electronic components!
The fanned deliveries AM 52 and AMS 52 are mobile. Their height is adjustable
by means of a gas-filled shock-absorber.
An additional control box (1) allows stopping and starting the machine (2) and
paper feed (3) to facilitate setting the hold-down rollers.
1
4
5
6
7
2
3
Fanned Deliveries
AM 52, AMS 52
Setting the Transfer
Height
Ł
Loosen the lock screw (4) by
turning it counter-clockwise.
Ł
Lift or lower the delivery table.
Ł
Tighten the lock screw (4) by
turning it clockwise.
Setting the Format
The hold-down rollers (5) are needed for
achieving a clean fanned delivery.
They prevent the folded sheets from
opening up on the delivery belt.
The hold-down rollers are adjustable
in two direction (6, 7).
When moving them sideways make sure that the rollers always run
on a delivery belt.
The distance between delivery shafts (8) and hold-down
roller (9) should correspond to the sheet length of the
folded sheet (10). To adjust, proceed as follows:
Ł
Turn the setting wheel (11) to the left or to the right
and shift the hold-down rollers to their new position.
Pushing the button (12) will move the delivery belts for
easy removal of sample sheets.
The pressure of the hold-down rollers can be changed
by turning the knurled screws (13).
Choose less pressure for thin paper below 80 GSM
and more pressure for paper above 180 GSM.
Electrical
Connection
The electrical connection of the delivery section is
made by plugging the connecting cable into the
socket (14) in the last fold unit.