5-7
FORMULA
SYSTEM OPERATION AND EQUIPMENT
SUN SPORT
Should the display indicate a system
failure, immediately disconnect shore
power sources (refer to Shore Power –
Section 5) and contact your Formula
dealer.
Ground Wire
Galvanic Isolator
Galvanic Isolator Monitor
Bonding System Protection
OVER
NORMAL
NORMAL
NORMAL
UNDER
FAIL
FAIL
If FAIL mode appears, disconnect the shore AC immediately!
If FAIL mode appears, disconnect the shore AC immediately!
test
FOR
3
11
GENERATOR
Operate the blower for at least four
minutes each time before you start the
generator.
A diesel power generator may have a
preheat switch used during starting. Do
not exceed 30 minutes of preheat time or
the manifold heater and plugs can be
damaged.
ON
ON
ON
OFF
12 VOLT DC SYSTEM
START
STOP
GENERATOR ROOM BLOWERS
MAIN
GENERATOR CONTROLS
FOR144
INT.
LIGHTS
REFIG.
STERO
SYSTEM
WATER
PUMP
WASTE
SYSTEM
12 V0LT
OUTLET
CO
SENSOR
1
2
ON
OFF
OFF
OFF
OFF
Generator Control Panel
Figure 5-8
1. Start/Stop Switch
2. Blower Switch
Galvanic Isolator Monitor
Figure 5-7
Summary of Contents for SUN SPORT
Page 20: ...2 12 FORMULA SUN SPORT SUN SPORT...
Page 22: ...3 2 FORMULA SUN SPORT SUN SPORT DIMENSIONS FOR218A F E C B D A FOR218A...
Page 42: ...3 22 FORMULA SUN SPORT SUN SPORT...
Page 120: ...9 8 FORMULA SUN SPORT SUN SPORT...
Page 124: ...10 4 FORMULA SUN SPORT SUN SPORT...
Page 128: ...11 4 FORMULA SUN SPORT SUN SPORT...
Page 132: ...12 4 FORMULA SUN SPORT SUN SPORT...
Page 134: ...13 2 FORMULA SUN SPORT SUN SPORT FUEL LOG Date Gallons Date Gallons Date Gallons Date Gallons...
Page 138: ...13 6 FORMULA SUN SPORT SUN SPORT...