STEP 4
: Reconnect Gas and Electrical Supply
Leak testing of the range shall be conducted according to the installation instructions provided with the
range.
Before operating the range after the gas conversion, always check for leaks with a soapy water solution or
other acceptable method in at gas connections installed between the gas inlet pipe of the range, gas
regulator, and the manual shut-off valve.
WARNING
DO NOT use a flame to check for gas leakage.
STEP 5
: Installation of New Rating Label
Record the model and serial number on the LP / Propane conversion label provided in this kit.
The information can be obtained from the existing Rating / Serial label.
Place the LPG conversion label
as
close as possible to the existing Rating / Serial label on the range.
Preparation
Before moving the range, protect any finished flooring and secure oven door(s) closed to prevent damage.
The oven door(s) can be removed to lighten the load or to fit the unit through a doorway. Only remove if
necessary. Do not remove the griddle or any other component. Door removal should only be done by a
certified installer or service technician.
Placement
Do not lift or carry the oven door by the door handle. Use an appliance dolly to move the range near the
opening. Remove and recycle packing materials. Do not discard the anti-tip bracket supplied with the range.
Leveling
Raise the range to the desired height by adjusting the legs. The legs can be adjusted by rotating the
clockwise to raise and counter clockwise to lower.
19
Summary of Contents for FFSGS6156-30
Page 1: ...FFSGS6156 30 FFSGS6156 36 FFSGS6156 48 09 03 21 dd mm yy...
Page 28: ...Wire Diagram 28...
Page 29: ...29...
Page 30: ...30...