CRANE RANGE
www.forsmw.com
23
4.4
Dismantling crane with three point linkage
1. Lower the drawbar to the ground.
2. Relieve the load on the axles for the three point linkage to make it easy to install.
3. Undo the two locking screws with locking nuts.
• Park the crane backwards with the crane nose resting on the ground so that the crane and the sup-
port legs are stable.
• Secure the lifting straps so that the crane is well balanced.
• Then lift of the crane together with the three point linkage away from the trailer’s vertical guide
pipes.
• Roll the trailer back so that the crane can be lowered freely to the ground.
When installing the three point linkage, the procedure is reversed.
1
2
3