Rack Installation Instructions
FortiAnalyzer-2000B Version 4.0 MR1 Rack and Hardware Install Guide
Revision 1
9
http://docs.fortinet.com/
•
Feedback
Figure 3: Installing and removing the rails (round-hole racks)
• Align each end piece to seat the pegs in the bottom hole of the first U and the top
hole of the second U (8).
• Engage the back end of the rail until it fully seats on the vertical rack flange and the
first “tooth” on the latch locks in place. Repeat these steps to position and seat the
front end piece on the vertical flange (9).
• To remove the rails, pull on the latch release button on the end piece midpoint and
unseat each rail (10).
4
To install the system into the rack, do the following:
• Pull the inner slide rails out of the rack until they lock into place (11).
7
8
9
10