13
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 2:
Install Bottom Rail
1.
Install cut
bottom rail into the lower installed brackets.
2. Pre-drill
Bracket Cup
holes for screws using a 3/16”
[89.5mm] drill bit.
3. Secure rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
Fig. 1
Straight
Bracket
Cup
Straight
Bracket
Cup
Fig. 2
Step 3:
Install Balusters Into Bottom Rail
1. Carefully slip Balusters vertically into each slot of the
bottom rail. Holes in balusters should not be visible after
insertion of baluster into rail. As shown in Fig. 1.
Tip:
•
Be sure to wear safety gloves and goggles when handling
Glass.
Set
Screw
Al
13
HOME Vertical Cable/
Pure View I-Support