4
Pre Chill
This program is used to Pre Chill the cabinet prior to the first cycle.
This is done with the
Blast Chiller empty and is a short time based program of about 20 minutes.
It is generally recognised as the correct method of preparing for a blast chill cycle.
The program is selected by rotating the dial until the display shows, press and release the dial
to start the program.
Defrost.
Defrosting is not normally required but if there is an ice build up on the coil inside the cabinet a manual defrost can be
selected. Rotate the dial until the Defrost screen, below left, is displayed.
Press and release the dial to start the defrost.
During defrost the screens will alternate between the middle and right hand screens.
Defrost will last 20 minutes and when completed the alarm will sound. Press the dial to acknowledged or if not wait until it
comes to the end of the alarm period, the alarm will stop and the display will revert to the previous screen.
Further Operational Features.
Chill time adjustment. (All programs excluding Professional 1, 2 or 3)
Whilst in the pre-programmed selection screen press and hold the dial for 2 seconds, the information screen will be
displayed, below left. Press and release the dial to move to the time set, see below right. Rotate the dial clockwise to
increase the time, anticlockwise to decrease. Once the time has been selected, press and release the dial and ‘CHILL
TEMP’ will be highlighted.
On completion press and hold the dial for 2 seconds to return to the program selection screen, to continue press and
release the dial for the program to start.
On completion of the program the time changes will revert to the default settings.
Chill / Hold temperature adjustments. (Professional 1, 2 or 3 only)
Professional 1, 2 and 3, if configured, are programs that can be used to tailor the chill time and temperature to suit
specific product requirements.
Adjust the ‘CHILL TIME’ as above. With the ‘CHILL TEMP’ highlighted, below second from the left, press and release the
dial to move to the temp set, below second from the right. Rotate the dial clockwise to increase the time, anticlockwise to
decrease. Once the time has been selected, press and release the dial and ‘HOLD TEMP’ will be highlighted. Follow the
procedure for changing chill temp to change the hold temp.
On completion press and hold the dial for 2 seconds to return to the program selection screen, to continue press and
release the dial for the program to start.
The chill time and chill / hold temperature adjusted settings are retained for professional 1, 2 and 3 programs and will not
revert to the default.
Summary of Contents for BC 21
Page 1: ...RBC20 60 Blast Chiller ...
Page 24: ...23 COMPRESSOR WIRING RBC20 60 ...
Page 25: ...RBC20 60 1 of 2 Wiring Diagram 24 ...
Page 26: ...RBC20 60 2 of 2 Wiring Diagram 25 ...
Page 27: ...RBC20 60R 1 of 2 Wiring Diagram 26 ...
Page 28: ...27 RBC20 60R 2 of 2 Wiring Diagram ...
Page 29: ......
Page 30: ...2 ...
Page 31: ...3 ...