PostBase Vision
20
Step 2:
Assembling the PostBase Vision
Installation site
The installation site for the PostBase Vision
franking system must meet the following
requirements:
– Firm, level, low vibration and horizontal
base, which offers sufficient space for the
franking system in the ordered configura-
tion. The dimensions of the individual com-
ponents can be found at page 185.
– Room temperature in the range from 15 °C
to 35 °C / 59 °F to 95 °F.
– No direct sunlight.
– Relative humidity within a range of 15% to
80%, non-condensing.
– Power outlet in the immediate vicinity.
– Network LAN or Wi-Fi connection with
internet access.
• The PostBase Vision franking machine
must be placed on a suitable surface.
• Remove the protective film from the
display.
Assembling the weighing platform
• Hold the weighing platform as shown in
the illustration and place it onto the scale
receptacle. The long slot in the foot of the
weighing platform must slide in the coun-
terpart on the scale receptacle.
Long slot