Transport platform
SEP Serie
SEP u
ser’s manual Page 49 of 89
Doc no. RD-7243-MA-001-02
7.8.4. Interruption and/or end of work
•
Lower the platform to the loading dock and unload it of all material.
∞
R
EFER TO SECTION
ON PAGE
•
Turn the key switch of the (
CC1
) panel to the "
ARRÊT/OFF"
position.
•
If necessary, remove the key and/or position the selector to "
ARRÊT/OFF"
(refer to effective
local standards and regulation.
Note:
it is not necessary to turn off the main switches (
480V
) unless otherwise mentioned.
Heating elements are present to warm the electric pieces at all time. This is most useful during
winter of in cold climates.
Summary of Contents for SEP-5000
Page 1: ......