background image

Customer Service: 1800-914-9835 | support@frameitall.com

STEP 4

: Arrange 6 (

S

) and 2 (

C

Timbers to create the 2

nd

level with 

the curved timber facing each end. 

ASSEMBLY INSTRUCTIONS

Use plugs (included) 

to cover the holes on 

both side of timbers

Use plugs to cover 

the holes – two 

plugs are required 

per bracket (1 on 

each side)

Use a Finishing  

Cap to complete  

the top level.

Use an Anchor  

or Stacking Joint  

for ground level

frames or borders.

Use only Stacking  

Joints when  

creating additional  

levels.

When creating a  

multi-level frame  

use a Stacking  

Joint.

Stacking Joints fit into  

the tops of Anchor  

Joints and other  

Stacking

Joints

How the Joints Work

STEP 6

: Add the caps to each of the top corner joints and plugs to cover the holes on 

both side of timbers.

STEP 5

: Arrange 2 (

S

) and 2 (

C

Timbers each to create the 3

rd

and 4

th

level with the curved timber facing 

each end. 

C

C

C

C

HAPPY GARDENING!!

Reviews: