background image

7

FRÄNKISCHE 

MBA profi-air defroster heating

7  Installation instructions 

7.2  Installation of the fresh air pipe 

In case of horizontal installation of the defroster heating, a flammable pipe / ventilation unit can be installed downstream 
of the heater coil.

In case of vertical installation of the defroster heating, a non-flammable pipe with a minimum length of 300 mm must be 
connected downstream of the heater coil. The pipe must be provided with non-flammable insulation.

profi-air iso pipe

Defroster heating

Ventilation unit

Spiral duct

Defroster heating

Ventilation unit

profi-air iso pipe

 

300

 mm

Summary of Contents for profi-air Series

Page 1: ...DRAINAGE SYSTEMS ELECTRICAL SYSTEMS BUILDING TECHNOLOGY INDUSTRIAL PRODUCTS profi air defroster heating DN 125 Installation and operating instructions...

Page 2: ...state of the art at the time of printing Furthermore considerable care was taken when preparing this publication Nevertheless typesetting and translation errors cannot be entirely excluded We also res...

Page 3: ...into operation as well as maintenance of the profi air defroster heating may be performed by authorised and qualified personnel only n Installation of the profi air defroster heating must be carried o...

Page 4: ...onnection cable n Insulation kit incl one set of infor mation and type plates sate The defroster heating can be switched on and off through the frost protection control incorporated in the ventilation...

Page 5: ...Electrical connection 1 230 V 50 Hz 1 m cable with connector plugs Heating performance 900 Watt Power consumption 4 1 A Safety components 1x safety temperature monitor 1x safety temperature limiter in...

Page 6: ...and secure fastening must be ensured The fasten ing material must be supplied on site Installation with the terminal box facing downwards is not permitted n The device may be used as a defroster only...

Page 7: ...ion unit can be installed downstream of the heater coil In case of vertical installation of the defroster heating a non flammable pipe with a minimum length of 300 mm must be connected downstream of t...

Page 8: ...1f U 230 V 50 Hz 1 IP44 P 900 W 100742 2016 06 Model Item No profi a ir Defros terhei tzung 180 flat 78312 830 FR NKIS CHE ROHRWE RKE Gebr Kirchner GmbH Co KG 97486 K nigsbe rg Bayern Tel 49 9525 88 2...

Page 9: ...R NKISC HE ROHRWE RKE Gebr Kirchner GmbH Co KG 97486 K nigsberg Bayern Tel 49 9525 88 2555 Fax 49 9525 88 2153 info gb_h fraenkische de www fraen kische com Air Luft flow only if unit vertically mount...

Page 10: ...4 3 6 6 4321 J2 F1 T2A SW2 A B J4 J6J7 J21 J8 J16 J17 J ANT BT1 1 2 1 2 1 2 1 2 1 4 2 5 1 3 2 4 3 6 6 4321 F1 T2A Pre Heater ByPass jumper 240VAC FACTORY ONLY FAN1 FAN2 230V AC FAN2 Control Pr FAN1 C...

Page 11: ...ust be regular ly inspected during maintenance prior to the beginning of the heating period The defroster heating or the ventilation unit must be disconnected from the network for maintenance 7 Instal...

Page 12: ...80 flat Pre heating of fresh air for apartments and residential buildings The product complies with the regulations particularly the protection requirements of the following EC directives Low Voltage...

Page 13: ...profi air defroster heating DN 125 has been developed and produced for applications in so called comfort ventilation systems Any other appli cation is considered improper and The manufacturer is not l...

Page 14: ...14 FR NKISCHE MBA profi air defroster heating Notes...

Page 15: ...15 FR NKISCHE MBA profi air defroster heating Notes...

Page 16: ...y Otto Kirchner Today we are globally represented with production facilities and sales offices The proximity to our customers enables us to develop products and solutions that are perfectly tailored t...

Reviews: