T
it
le
Franklin Home Power User Manual
Date
August 10, 2021
Doc. No.
FD21081001
Revision
V01
© 2021. FranklinWH Technologies Co., Ltd.
Page 27 Total 31
⑦
VPP
aGate compliances with IEEE2030.5 protocol. aGate can enable VPP mode when you sign a VPP contract with
the local utility carrier. aGate would be connected to utility carrier’s servers and to enable VPP by the policy
control.
4)
Smart Circuit schedule
In this UI, you will set up the parameters of aPower SOC lower limit, time enable and plan.
Smart circuit can control your load on/off on time automatically or manually.
Smart circuit can serve for air conditioner in summer, swimming pooling pumps, garden lighting, garden gate motor,
garage door motor, etc.
5)
More operations
①
OTA upgrading
②
Remote diagnosis
③
History
④
Location and time zone settings
9
,
Maintenance
Danger! aPower and aGate are not user-serviceable and must be repaired by FrnaklinWH Technology Co., Ltd trained
and authorized installer.
Keep the wiring connection in order. Do not change the connections inside by user yourself. Do not pull out or insert the
terminals of the power cables and signal cables when the cables are active and live.
If need, please contact the installer or FrnaklinWH’s local service team.
Table spare parts list
Item
Description
Remarks
1
PE unit box
Power inverters system box inside
2
aPower
3
EMU box
In aGate
4
Grid inputs relay
In aGate
5
Generator inputs relay In aGate
6
AC meter in aGate
7
Solar board in aGate
8
Smart circuit Board
9
CTs in aGate
10
,
Troubleshooting
Please be sure of the following steps if the system is not working normally.