Operation and Maintenance Manual, OnyX Sky Heat Recovery Units, 2022/01
Frapol Sp. z o.o. reserves the right to introduce changes without any prior notice.
Page
26
In order to reduce the interferences with temperature measurements by the panel, avoid direct sunlight, poor
air circulation, close vicinity to heating devices, doors and windows (typically at least 200 mm from the edge
of the door).
Basic panel
Advanced panel (optional equipment)
NOTE
The panel and the controller can only be installed by the manufacturer of air handling units, or an
installer familiar with this manual.
Installation must be carried out in accordance with the applicable regulations, standards and guidelines given
in the documentation of the controller.
NOTE
Only the original shielded cable ensures correct operation of the unit. Cable extensions and any
tampering with electrical connections are not permitted and will void the warranty.
5.6.3
Installation
•
Basic control panel
The control panel consists of two parts:
- panel with display (1), hooks (3), and latches (4)
- mounting cover (2).
When installing the panel, follow the steps below:
Fix the cover (2) to the wall with screws (4 x 2.9 x 13 mm), necessarily in the orientation according to the following
figure.