3
TABLE OF CONTENTS
PAGE
SECTION
2.12.
Energy meter installation for Dynamic Power Management (optional)
28
2.13.
Shunt trip installation (optional)
30
2.14.
Closing operations and power supply
30
3.
MAINTENANCE
31
4.
PRODUCT DISPOSAL
32
5.
ASSISTANCE
32
DISCLAIMER
32