18
23
24
24. Orient the Tower Cap (2) as shown.
Slide the Tower Cap (2) downward onto the
Tower Frame (1). Attach the Tower Cap with two
M4 x 13mm Self-tapping Screws (27).
25.
Make sure that all parts of the strength equipment are properly tightened.
To protect the floor or carpet
from damage, place a mat under the strength equipment.
23. Slide the two remaining Shrouds (36) downward
into the two strips of Outer Trim (5) on the front
of the Tower Frame (1).
36
36
5
5
1
2
27
27
1
Summary of Contents for FLY/REAR DELT F806.0
Page 24: ...24 NOTES...