8
3
3. Attach the upper end of the Upright (72) to the
upper end of the Tower Frame (1) with two M10
x 30mm Socket Patch Screws (30) and two
M10 Washers (31).
Do not tighten the Socket
Patch Screws yet.
2
2. Orient the Tower Frame (1) as shown.
Have a
second person hold the Tower Frame to pre-
vent it from falling until you complete step 4.
Remove the two M10 x 30mm Socket Patch
Screws (30), the two M10 Washers (31), and
the Small Pulley Bracket (6) from the back of
the Tower Frame (1).
Next, remove the M10 Locknut (32), the M10 x
50mm Socket Bolt (29), the two M10 Washers
(31), and the Large Pulley (24) from the Small
Pulley Bracket (6).
31
31
31
31
31
29
6
1
1
30
24
32
72
30
Summary of Contents for FLY/REAR DELT F806.0
Page 24: ...24 NOTES...