Freescale Semiconductor
13
Figure 7. Found New Hardware Wizard (Screen 2)
Left: Project Board USB BDM Right: Application Module USB BDM
5) Successful installation is verified by Found New Hardware (Screen 3) illustrated by Figure 8. Click
Finish to complete installation and close the wizard.
Figure 8. Found New Hardware Wizard (Screen 3)
Left: Project Board USB BDM Right: Application Module USB BDM
6) Validation that the USB is properly installed can be done by verifying that the VDD LEDs, and USB
status lights are lit.
7) The hardware is now ready for development and use.