Installation Instruction
1.
Connect the arm swinging connecting block (52) with the adjusting tube (18), and fix it with the bolt (50).
2.
Install the arm swinging connecting shaft (55) on the arm swinging-left (53), arm swinging-right (54) and the
arm swinging connecting block (52) respectively, and fasten them with M10*20 inner hexagonal bolts.
3.
Install the barbell cover (57) on the arm swinging-left (53) and arm swinging-right (54) respectively with
M10*20 outer hexagonal bolts.
4.
Install the handles (56) on the arm swinging-left (53) and arm swinging-right (54) respectively.
5.
Install the push rod (58) on the arm swinging-left (53) and arm swinging-right (54), and fix them with bolts
(50).
6.
Connect the connecting ring (59) to the arm swinging-left (53) and arm swinging-right (54), and connect the
other end to the ball end of the steel rope (32).
Installing Step 9 Assembling Diagram
28
Summary of Contents for FF-FSR90
Page 1: ...FF FSR90 ASSEMBLY MANUAL MULTI FUNCTIONAL TRAINER SMITH RACK SYSTEM 1...
Page 11: ...Installing Step 1 Exploded Diagram 11...
Page 13: ...Installing Step 2 Exploded Diagram 13...
Page 15: ...Installing Step 3 Exploded Diagram 15...
Page 17: ...Installing Step 4 Exploded Diagram Installing Step 4 Exploded Diagram 17...
Page 19: ...Installing Step 5 Exploded Diagram 19...
Page 21: ...Installing Step 6 Exploded Diagram 21...
Page 23: ...Installing Step 7 Exploded Diagram 23...
Page 25: ...Installing Step 8 Exploded Diagram 25...