15
5.
INSTALLATION
5.1.
Requirements for installation the multideck
Installation of the unit must be performed following next requirements:
•
The unit must be aligned horizontally (both depth and length) and installed in
the stable position.
•
Set up the unit only on the designated adjustable legs.
•
It is forbidden to install the unit close to any heating equipment or any HVAC
elements (air outlet etc.).
•
Keep a sufficient distance around the unit. It must be possible to open the doors
without any obstructions.
o
The exhaust air must be able to escape freely at the top of the unit.
o
Minimum clearance from ceiling 500 mm. Lower minimum clearance must
be approved by the manufacturer.
o
Superstructures or false ceilings directly on top of the unit should only be
installed after consultation with the manufacturer.
•
To allow warm air to escape, there must be a gap of at least 150 mm between
the ceiling and all hanging billboards. Lower minimum gap only in agreement
with the manufacturer.
Fig.7.
Example of unsuitable ambient conditions
Summary of Contents for JUPITER H8
Page 1: ...OPERATION MANUAL MULTIDECK JUPITER ...
Page 14: ...14 Install the plastic legs Lower the multideck ...
Page 19: ...19 Seal connection gaps using the adhesive foam tape ...
Page 20: ...20 Apply silicone as shown in the picture to seal the joint ...
Page 24: ...24 Secure brackets on the legs Secure the tapped clips to the dust cover ...
Page 43: ...43 Date Work Name ...