210.100-IOM (JUL 2018)
Page 3
ACUAIR
®
HYGIENIC AIR UNITS
INSTALLATION - OPERATION - MAINTENANCE
TABLE OF CONTENTS
RECEIVING & INSPECTION ................................................ 8
STORAGE .......................................................................... 8
SUPPORT STRUCTURE INFORMATION ............................ 10
SECTION RECONNECT SHIP LOOSE ITEMS ..................... 11
INSTALLATION TOOLS .................................................... 11
GENERAL SPLIT UNIT REASSEMBLY ................................ 12
REMOVABLE LIFTING LUGS ............................................. 12
ELECTRICAL WIRING/PIPING ........................................... 12
PERFORMANCE GRADE CONNECTIONS .......................... 13
REASSEMBLY PROCEDURE FOR SPLIT UNIT
PERFORMANCE SERIES ONLY ...................................... 13
RECONNECTION ATTACHMENT AND SEALING
PROCEDURE ................................................................ 14
INSULATION OF THE BASE RECONNECT SEAM OF AN
ACUAIR PERFORMANCE SERIES UNIT ......................... 15
ROOF SEALANT PROCEDURE .......................................17
ACUAIR FOOD GRADE OR SANITARY SERIES
ROOF RECONNECT FINISH ........................................ 19
INSULATION OF THE BASE RECONNECT SEAM OF AN
ACUAIR FOOD GRADE OR SANITARY SERIES UNIT ...... 21
ACUAIR UNIT BASE RECONNECT INSULATION ............. 22
ACUAIR FRESH AIR INTAKE PLENUM .............................. 23
FAN HOLD-DOWN / SPRING ISOLATOR SETUP ............... 25
CONDENSATE DRAIN TRAP SIZING ................................. 26
DRAIN PAN CONSTRUCTION ........................................... 26
FIELD PIPING REQUIREMENTS ........................................ 26
DUCT CONNECTIONS .......................................................27
WEATHER HOOD CONNECTION DIRECT TO THE ACUAIR
FRESH AIR OPENING ................................................... 28
FILTER INSTALLATION TABLE OF CONTENTS ................... 30
FILTER LATCHES .............................................................. 30
ACUAIR SINGLE FILTER APPLICATION (NON-HEPA) ......... 31
HEPA FILTER APPLICATION ............................................. 33
NON-HEPA FILTERS IN HEPA FRAMES ............................ 33
Installation of a RIGID DH Double-Headered filter
HEPA FILTERS ................................................................. 36
INITIAL START-UP ...........................................................37
Blower, Motor, Drives .....................................................37
NEW BELT RUN-IN ..........................................................37
START-UP AFTER PROLONGED SHUTDOWN .................... 38
DAILY OPERATION AND ROUTINE MAINTENANCE........... 39
COIL MAINTENANCE ....................................................... 39
DAMPER MAINTENANCE ................................................ 39
FILTER MAINTENANCE ....................................................40
ELECTRICAL CONDUIT SEALING REQUIREMENT ..............40
TEMPERATURE SENSOR CALIBRATION ...........................40
Two calibration methods are: ........................................ 40
GALVANIZED STEEL ..................................................... 41
FAN BEARING LUBRICATION ........................................... 42
FAN SEGMENT-FAN MOTOR ........................................... 42
Mounting Hardware and Adjustable Motor Base ............ 42
Motor Condition (Visual) ................................................ 42
Electrical Checks ............................................................ 42
Lubrication ..................................................................... 43
INSPECTING V-BELTS AND SHEAVES ..............................44
TENSIONING V-BELTS AND SHEAVES .............................44
OPERATING AND MAINTENANCE INSTRUCTIONS FOR
PIEZOMETER ............................................................... 46
RECOMMENDED MONTHLY SERVICE .............................. 46
MAINTENANCE INTERVALS ............................................. 47
RECOMMENDED MAINTENANCE INTERVALS .................. 47
SPARE PARTS RECOMMENDATIONS ............................... 47
ACUAIR FACTORY START-UP ASSISTANCE ..................... 49
ACUAIR AIR HANDLER PRESTART-UP CHECKLIST ........... 50
PRESTART-UP (For Site Records) .................................... 50