210.100-IOM (JUL 2018)
Page 50
ACUAIR
®
HYGIENIC AIR UNITS
INSTALLATION - OPERATION - MAINTENANCE
Fan Inspection
Verify that bearings and locking collars have properly tightened
setscrews, bolts and nuts.
Fan wheel properly aligned, tight on shaft and freely moving.
Sheaves properly aligned and tight on shaft.
Verified
fan base isolators and thrust restraints for proper
adjustment.
NOTE: Do not remove functional bolts from
seismic isolators.
Belt tension adjusted properly per drive package label on fan.
Verified fan alignment with unit discharge. Adjust with
isolation.
Fan bearings properly lubricated.
PRESTART-UP (For Site Records)
GENERAL UNIT INSPECTION
Identify and perform appropriate "lockout/tag out" and safety rules. For details on points below, see appropriate section of
Installation, Operation, Maintenance manual provided with each air handler. For VFD equipped air handlers, refer to the VFD
forms for additional start-up requirements.
ACUAIR AIR HANDLER PRESTART-UP CHECKLIST
Name of Installing Contractor ______________________________ Unit Tag # _________________________________________
Qualified Technician’s Name:
______________________________ Unit Model # ______________________________________
Frick Sales Order # _______________________________________ Unit Serial # _______________________________________
Job Name _______________________________________________
Job Site Location ________________________________________
Job Site Contact and Phone # _____________________________
Unit inspected for damage interior and exterior.
Condensate drain properly trapped.
Unit installed on flat and level surface.
Outdoor unit mounted
within roof slope limitations where applicable.
Air hoods installed properly.
Package Installed According to 090.400-SB (Proper Installation
of Electronic Equipment)
Terminal screws and wiring connections secure
in control, electric and Air Modulator panels.
All shipping splits sealed and secured properly.
Verify
that all ductwork is complete and available for full airflow.
Unit installed with proper clearances.
Clean air filters installed properly and secured.
Visually inspect roof curb for tight seal around unit.
Damper linkage is tight and in correct "power off" position.
All shipping bolts and other material have been removed. (Fan,
VIFB, Energy Recovery Wheel, Damper)
Pipe chase floor sealed at penetrations.
All shipped loose parts installed.
Pneumatic tubing for room pressure sensors is in place.
Controls installation complete.
Filter gauge is installed in supply ductwork and set to zero
Remote Panel is mounted and wired.
Verify all plastic spacers have been removed between door and
door frame.
Unit control panel is accessible. (Catwalk, ladder, etc.)
Verify Energy Recovery Wheel turns freely and wheel segments
are fully engaged.
All field wiring complete and inspected.
Installer has cleaned out interior.
All wiring and tubing connections made at
shipping splits.
Correct line voltage is supplied at disconnect.
All field piping connections complete.
Burners
Gas Supply is provided up to unit.
Flue is installed, if needed.
Gas supply pressure is correct.
Gas line is purged.
PRV installed, if required?
I have reviewed, understand, and acknowledge the terms and conditions of Johnson Controls start-up policies detailed
in this document. The information that is provided in the prestart-up checklist is accurate.
Authorized Signature
Authorized Firm
Phone #
Please FAX to Johnson Controls - Frick Service: 717-762-8624